November 17, 2010 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
No edit summary
 
No edit summary
 
Line 1: Line 1:
present: Sergey Boyarinov, Sergey Pozdnyakov, Chris Cuevas, Eugene Pasyuk, McMollen, eng, Latifa
present: Sergey Boyarinov, Sergey Pozdnyakov, Chris Cuevas, Eugene Pasyuk, McMollen, eng, Latifa, Ben Raydo, Glen, Nerses
 
1. SVT: VME or so readout board not covered, have to find group to design and produce it; will have a phone meeting with FNAL asap (Kwan)
 
2. TPE preparations
 
* LAC TDCs/DISCR wired back
 
* new TDCs and DISCR installed to EC4 and wired - for TPE cal and DFM
 
* need scalers: Sergey P. daq ones, nerses epics ones
 
* need HV
 
* fastbus TAGE was removed, VME installed, need to check flat cables and cleanup everything; trans table must be changed
 
* DC cosmic test needed - for Dc and level2 control check
 
* level1 to be completed and test

Latest revision as of 11:08, 17 November 2010

present: Sergey Boyarinov, Sergey Pozdnyakov, Chris Cuevas, Eugene Pasyuk, McMollen, eng, Latifa, Ben Raydo, Glen, Nerses

1. SVT: VME or so readout board not covered, have to find group to design and produce it; will have a phone meeting with FNAL asap (Kwan)

2. TPE preparations

  • LAC TDCs/DISCR wired back
  • new TDCs and DISCR installed to EC4 and wired - for TPE cal and DFM
  • need scalers: Sergey P. daq ones, nerses epics ones
  • need HV
  • fastbus TAGE was removed, VME installed, need to check flat cables and cleanup everything; trans table must be changed
  • DC cosmic test needed - for Dc and level2 control check
  • level1 to be completed and test