November 11, 2009 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
No edit summary
(No difference)

Revision as of 11:16, 11 November 2009

present: Sergey Boyarinov, Sergey Pozdnyakov, Ben Raydo

1. JLAB discriminator board prototype was tested by Sergey P., latest test was with triangle pulse, all results obtained with rectangular pulse were confirmed, although threshold slope changed slightly: 0.235 (triangle) and 0.263(rectangular), Ben will check it, it must be exactly 0.25. Passive splitters were used. Temperature test still to be done. Board will go to Ben for more tests and changes. When ready, will order 5 boards.


2. eg6 run reached production stage after about month of commissioning, number of DAQ problems were resolved. Main problem was related to the pipeline regime in TPC readout, it was fixed by CERN/ALICE personal due to Raffaella DeVita efforts.