September 23, 2009 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(No difference)
|
Revision as of 10:16, 23 September 2009
present: Sergey Boyarinov, Sergey Pozdnyakov
1. Next run preparations:
- BONUS readout: 3 PCs with Linux, 3 TI PCI cards, 3 RORCs, 6 crates, 26 FEC cards; new PCs will be installed on North SF, probably in DCHV rack on the floor; they will be connected to the branch instead of tage, tage2 and tage3