present: Sergey Boyarinov,
present: Sergey Boyarinov, Chris Cuevas, Sergey Pozdnyakov, Nerses Gevorgyan


1. CLAS12
1. CLAS12


* discr
* discr: see [[JLAB Discriminators]]


* DC
* DC - SF decks 1 and 3; 18 ADB crates, 10 FASTBUS crates


* HV connectors
* CAEN HV connectors - still under investigation by Sergey P. and Armen; will ask CAEN and connector manufacturer for advice; in a meanwile, new patch panels can be produces without puting multipin connectors; need 8 24-pin patch panels


2. eg1-dvcs
2. eg1-dvcs


* FBPM
* UVC want more money for Lecroy HV repair - will pay; we have 5 mainframes in repair right now, 2 bad in counting house; one SY1527 in repair, will send one by one; took one form Yuri, installed as HVEC2; SY527 will be upgraded(caenet upgrade), waiting for RMA


* DC EPICS
* 1881M ADC for FBPM was installed in DC11, need to check if all wires are connected, and check GATE timing (is TDC stop good enough)


....
* DC EPICS support is finished, under testing; will add DC to standard GUIs; Sergey B. will meet with Vardan and DC experts to make sure everything is correct; both EPICS and DCHV should work in parallel
 
* clon01 OS was reinstalled (Solaris 10 Update 6) and patched, need to check all EPICS functionality; clonpc2 epics login need check

Latest revision as of 11:35, 28 January 2009

present: Sergey Boyarinov, Chris Cuevas, Sergey Pozdnyakov, Nerses Gevorgyan

1. CLAS12

  • DC - SF decks 1 and 3; 18 ADB crates, 10 FASTBUS crates
  • CAEN HV connectors - still under investigation by Sergey P. and Armen; will ask CAEN and connector manufacturer for advice; in a meanwile, new patch panels can be produces without puting multipin connectors; need 8 24-pin patch panels

2. eg1-dvcs

  • UVC want more money for Lecroy HV repair - will pay; we have 5 mainframes in repair right now, 2 bad in counting house; one SY1527 in repair, will send one by one; took one form Yuri, installed as HVEC2; SY527 will be upgraded(caenet upgrade), waiting for RMA
  • 1881M ADC for FBPM was installed in DC11, need to check if all wires are connected, and check GATE timing (is TDC stop good enough)
  • DC EPICS support is finished, under testing; will add DC to standard GUIs; Sergey B. will meet with Vardan and DC experts to make sure everything is correct; both EPICS and DCHV should work in parallel
  • clon01 OS was reinstalled (Solaris 10 Update 6) and patched, need to check all EPICS functionality; clonpc2 epics login need check