January 28, 2009 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
present: Sergey Boyarinov, | present: Sergey Boyarinov, Chris Cuevas, Sergey Pozdnyakov, Nerses Gevorgyan | ||
1. CLAS12 | |||
* discr: see [[JLAB Discriminators]] | |||
* DC - SF decks 1 and 3; 18 ADB crates, 10 FASTBUS crates | |||
* CAEN HV connectors - still under investigation by Sergey P. and Armen; will ask CAEN and connector manufacturer for advice; in a meanwile, new patch panels can be produces without puting multipin connectors; need 8 24-pin patch panels | |||
2. eg1-dvcs | |||
* UVC want more money for Lecroy HV repair - will pay; we have 5 mainframes in repair right now, 2 bad in counting house; one SY1527 in repair, will send one by one; took one form Yuri, installed as HVEC2; SY527 will be upgraded(caenet upgrade), waiting for RMA | |||
* 1881M ADC for FBPM was installed in DC11, need to check if all wires are connected, and check GATE timing (is TDC stop good enough) | |||
* DC EPICS support is finished, under testing; will add DC to standard GUIs; Sergey B. will meet with Vardan and DC experts to make sure everything is correct; both EPICS and DCHV should work in parallel | |||
* clon01 OS was reinstalled (Solaris 10 Update 6) and patched, need to check all EPICS functionality; clonpc2 epics login need check |
Latest revision as of 11:35, 28 January 2009
present: Sergey Boyarinov, Chris Cuevas, Sergey Pozdnyakov, Nerses Gevorgyan
1. CLAS12
- discr: see JLAB Discriminators
- DC - SF decks 1 and 3; 18 ADB crates, 10 FASTBUS crates
- CAEN HV connectors - still under investigation by Sergey P. and Armen; will ask CAEN and connector manufacturer for advice; in a meanwile, new patch panels can be produces without puting multipin connectors; need 8 24-pin patch panels
2. eg1-dvcs
- UVC want more money for Lecroy HV repair - will pay; we have 5 mainframes in repair right now, 2 bad in counting house; one SY1527 in repair, will send one by one; took one form Yuri, installed as HVEC2; SY527 will be upgraded(caenet upgrade), waiting for RMA
- 1881M ADC for FBPM was installed in DC11, need to check if all wires are connected, and check GATE timing (is TDC stop good enough)
- DC EPICS support is finished, under testing; will add DC to standard GUIs; Sergey B. will meet with Vardan and DC experts to make sure everything is correct; both EPICS and DCHV should work in parallel
- clon01 OS was reinstalled (Solaris 10 Update 6) and patched, need to check all EPICS functionality; clonpc2 epics login need check