October 15, 2008 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(No difference)
|
Revision as of 09:52, 15 October 2008
present: Sergey Boyarinov,
- DVCS-CLAS trigger
third rack was installed to make cabeling easy; all racks connected to the clean power, one more power strip was ordered to use second 20A circuit
cabling between splitters and discriminators has been started in according to the Ben's map
forward carreage is in position and DVCS-CLASTRIG cable was can to the nominal length, signal is in gate about 30ns from the beginning of the gate pulse, gate cables is in production, hope to get another 20ns