June 4, 2008 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
* finish inventory database (tag numbers, serial numbers) | * finish inventory database (tag numbers, serial numbers) | ||
* FC level1 rearrangement: need a rack/crate layout !!!sector-based layout including level0 looks interesting, will discuss on Friday upgrade meeting; leve1 south will be shifted one rack left, CC gas must be moved and the rest from the right rack must be removed cleaning up tof laser electronics; TOF pretrigger discr replacement can be considered because of new trigger OR modules makes no difference, JLAB discriminators can be useful to save on scalers | * FC level1 rearrangement: need a rack/crate layout !!!sector-based layout including level0 looks interesting, will discuss on Friday upgrade meeting; leve1 south will be shifted one rack left, CC gas must be moved and the rest from the right rack must be removed cleaning up tof laser electronics and software; TOF pretrigger discr replacement can be considered because of new trigger OR modules makes no difference, JLAB discriminators can be useful to save on scalers | ||
* deside about new trigger for electron runs; make DVCS trigger (new electronics needed); order flat cables/connectors; | * deside about new trigger for electron runs; make DVCS trigger (new electronics needed); order flat cables/connectors; |
Latest revision as of 10:07, 4 June 2008
present: Sergey Boyarinov, Sergey Pozdnyakov
1. G12 almost over; printer was broken, RC John Price pushed CC to install temporary one, need new printer; CODA problems still the same: msql diamon, tage* crashes, EB must be restarted - Sergey is studying
2. Summer plans:
- FASTBUS supply upgrade
- new printer
- CLAS CODA: new release, devel area will have mysql instead of msql (if exist on vxworks), new diagnostics and tests, CC scan monitoring (block 71 subnet ?)
- finish inventory database (tag numbers, serial numbers)
- FC level1 rearrangement: need a rack/crate layout !!!sector-based layout including level0 looks interesting, will discuss on Friday upgrade meeting; leve1 south will be shifted one rack left, CC gas must be moved and the rest from the right rack must be removed cleaning up tof laser electronics and software; TOF pretrigger discr replacement can be considered because of new trigger OR modules makes no difference, JLAB discriminators can be useful to save on scalers
- deside about new trigger for electron runs; make DVCS trigger (new electronics needed); order flat cables/connectors;