March 12, 2008 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 23: Line 23:
* make sure level2 works with new electronics; single sector outputs from FPGA ? use L2 latch ? (it will be served as sector-based pattern as well ..)
* make sure level2 works with new electronics; single sector outputs from FPGA ? use L2 latch ? (it will be served as sector-based pattern as well ..)


* pulser events and level2 ???????
* pulser events and level2 ??????? want l2pass in that case ...
 
* 2 test cables for Ben (68-68)
 
* add EC to trigger ? extra 2 inputs per sector (inner and total from one discriminator, outer never used); will discuss again after L2 situation decided,
may do not need 1-6 outputs as sector-based
 
* install everything in the hall, start installation today; Valery and Raffaella will think about test plan using cosmic/pulser
 
 
2. G12 run: EPICS information in data stream, Raffaella will check it
some fixes in DAQ (Sergey)
EPICS expert ???
 
 
3. INFN will by TPC electronics

Latest revision as of 10:16, 12 March 2008

present: Sergey Boyarinov, Ben Raydo, Sergey Pozdnyakov, Raffaella Devita, Valeri Kubarovski

1. G12 trigger

  • do not destroy existing trigger
  • new VME crate on top of trigger rack, all OR modules there, VME repeater
  • about 50 scalers, 2 reads by 16bit, every 10 seconds (latch is coping to output regs
  • no event-by-event read, or need input pattern fifo ? or at least single sector pattern .. will discuss
  • control: gui on clonwin2, vxworks server; gui will save to file to be used during run
  • Ben's setup will stay
  • ECL output cards to be here soon
  • install CC and GUI on clonwin2
  • testing: self-test in Ben's office; cosmic etc tests to be planned
  • make sure level2 works with new electronics; single sector outputs from FPGA ? use L2 latch ? (it will be served as sector-based pattern as well ..)
  • pulser events and level2 ??????? want l2pass in that case ...
  • 2 test cables for Ben (68-68)
  • add EC to trigger ? extra 2 inputs per sector (inner and total from one discriminator, outer never used); will discuss again after L2 situation decided,

may do not need 1-6 outputs as sector-based

  • install everything in the hall, start installation today; Valery and Raffaella will think about test plan using cosmic/pulser


2. G12 run: EPICS information in data stream, Raffaella will check it some fixes in DAQ (Sergey) EPICS expert ???


3. INFN will by TPC electronics