TO DO List for SP: Difference between revisions
Jump to navigation
Jump to search
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Inventory DB for Hall B electronics == | == Inventory DB for Hall B electronics == | ||
Line 23: | Line 21: | ||
* account of repair frequency and quality | * account of repair frequency and quality | ||
== Electronics repair == | |||
* Trace current repair | |||
- Motorola PMC Card | |||
- two HV Mainframes | |||
- ORTEC HV Card | |||
* Send out, <span style="color:red"> all should be prepared for Monday December 10, 2007 !!! </span> | |||
- get quotation for LeCroy 2313 | |||
- get quotation for LeCroy HV Card 1461N | |||
- make a requisition based on quotations | |||
- quotation obtained for 5 Discriminators and 5 HV Cards | |||
- pack 5 LeCroy 2313 Discriminator <span style="color:red"> | |||
- double check one 1461P !!!!! | |||
- collect 5 !!! 1461N and pack them </span> | |||
- boxing and shipping out for repair | |||
* Test repaired electronics | |||
- three LeCroy HV Mainframe 1458: | |||
* currently all in test in CR, 6-Dec-2007 | |||
* Mainframe-1 (ARCnet=1) has one HV Card in slot#2, all ch. loaded | |||
* Mainframe-3 (ARCnet=3) has one HV Card in slot#4, all ch. empty | |||
* Mainframe-2 (ARCnet=2) has 10 HV Cards, all loaded except sl.#11 | |||
- three CAEN Discriminator v895: | |||
a) one in CR testsetup; | |||
b) two in Benjamin Raydo testsetup. | |||
== Maintenance of Hall B electronics == | == Maintenance of Hall B electronics == | ||
== CAMAC electronics == | |||
* check board availability | |||
* check alive status | |||
* arrange and revise test-scripts | |||
* revise photon trigger logic |
Latest revision as of 10:17, 10 December 2007
Inventory DB for Hall B electronics
- complete inventory list of Hall B electronics
- modify this list in easy-view/easy-search format
- label all coming-in and coming-out electronics
- excess unused and ancient electronics
File repair documentations
- sort by functionality
- sort by repair company
- trace by RMA
- account of repair frequency and quality
Electronics repair
- Trace current repair
- Motorola PMC Card - two HV Mainframes - ORTEC HV Card
- Send out, all should be prepared for Monday December 10, 2007 !!!
- get quotation for LeCroy 2313
- get quotation for LeCroy HV Card 1461N
- make a requisition based on quotations
- quotation obtained for 5 Discriminators and 5 HV Cards
- pack 5 LeCroy 2313 Discriminator
- double check one 1461P !!!!!
- collect 5 !!! 1461N and pack them
- boxing and shipping out for repair
- Test repaired electronics
- three LeCroy HV Mainframe 1458: * currently all in test in CR, 6-Dec-2007 * Mainframe-1 (ARCnet=1) has one HV Card in slot#2, all ch. loaded * Mainframe-3 (ARCnet=3) has one HV Card in slot#4, all ch. empty * Mainframe-2 (ARCnet=2) has 10 HV Cards, all loaded except sl.#11
- three CAEN Discriminator v895: a) one in CR testsetup; b) two in Benjamin Raydo testsetup.
Maintenance of Hall B electronics
CAMAC electronics
- check board availability
- check alive status
- arrange and revise test-scripts
- revise photon trigger logic