October 31, 2007 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
No edit summary
Boiarino (talk | contribs)
No edit summary
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
present: Sergey Boyarinov, Benjamin Raydo, Sergey Pozdnyakov
present: Sergey Boyarinov, Benjamin Raydo, Sergey Pozdnyakov


Ben presented new DVCS Trigger system design which includes DVCS Calorimeter and Hodoscope, Power Point presentation can be found [here].
Ben presented new DVCS Trigger system design which includes DVCS Calorimeter and Hodoscope, Power Point presentation can be found [http://clonweb/wiki/clondocs/DVCS_Trigger/TriggerSystem_Delays.ppt here], or [file://clondocs/DVCS_Trigger/TriggerSystem_Delays.ppt here]. Presented design is not final, but contains final amount of boards we have to buy. Sergey will request quotations and order all necessary hadrware from CAEN. We may expect to get it in about 3 month, so actual assembly may started in February 2008.
 
Ben will finish design, including detailed electrinics layout and cabling, in 1-2 weeks. After that project will be posponded until February 2008 when we'll start actual system assembly. In a meanwhile Sergey will resume CLAS12 Trigger system design efforts, developing algorithms based on DVCS Trigger design experience. Ben will provide support in a form of new algorithm simulation. We'll try to finish preliminary design for CLAS12 Trigger system by February 2008.

Latest revision as of 09:50, 7 November 2007

present: Sergey Boyarinov, Benjamin Raydo, Sergey Pozdnyakov

Ben presented new DVCS Trigger system design which includes DVCS Calorimeter and Hodoscope, Power Point presentation can be found here, or [file://clondocs/DVCS_Trigger/TriggerSystem_Delays.ppt here]. Presented design is not final, but contains final amount of boards we have to buy. Sergey will request quotations and order all necessary hadrware from CAEN. We may expect to get it in about 3 month, so actual assembly may started in February 2008.

Ben will finish design, including detailed electrinics layout and cabling, in 1-2 weeks. After that project will be posponded until February 2008 when we'll start actual system assembly. In a meanwhile Sergey will resume CLAS12 Trigger system design efforts, developing algorithms based on DVCS Trigger design experience. Ben will provide support in a form of new algorithm simulation. We'll try to finish preliminary design for CLAS12 Trigger system by February 2008.