October 10, 2007 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(3 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
* datafile containing DVCS raw data was created by Rustam and Sergey and passed to Ben | * datafile containing DVCS raw data was created by Rustam and Sergey and passed to Ben | ||
* Ben made event display to present and control cluster reconstruction process using Altera simulation tools; it has two adjustable parameters: single channel threshold (the same for all channels, was set to 50) and minimum number of hits per cluster (was set to 3); cluster finding window has fixed size 3x3 towers (bigger or variable size | * Ben made event display to present and control cluster reconstruction process using Altera simulation tools; it has two adjustable parameters: single channel threshold (the same for all channels, was set to 50) and minimum number of hits per cluster (was set to 3); cluster finding window has fixed size 3x3 towers (bigger or variable size window requires more space in FPGA); future plan includes processing good file with different parameters, making 2-dimentional plots, getting efficiency, then processing all data and getting rejection | ||
* we discussed how much regular user have to learn | * we discussed how much regular user have to learn about v1495 programming; it maybe good idea to learn Altera graphic tool which allows to assemble simple logic from prepared components | ||
* we've got quotation for 2 more v895 discriminators from CAEN, they will be ordered | * we've got quotation for 2 more v895 discriminators from CAEN, they will be ordered | ||
Line 21: | Line 21: | ||
* 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100 | * 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100 | ||
* new ET installed, everything looks good so far; ''et_2_et'' has new option ''direct'' for communication between machines which are not sharing | * Carl Timmer finished new version of ET, it was installed into CLON area, everything looks good so far; ''et_2_et'' has new option ''direct'' for communication between machines which are not sharing subnets | ||
* old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller; will run for a while to get experience | * old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller were observed, workarounds implemented, may contact CAEN about that; will run for a while to get experience | ||
TODO: | TODO: | ||
* | * sy527 mainframe in wolfram area need serial remote control | ||
* include LAC into old EPICS GUIs | * include LAC into old EPICS GUIs | ||
Line 35: | Line 35: | ||
* fix fan in mainframe 1 in LAC (Tom Carstens) | * fix fan in mainframe 1 in LAC (Tom Carstens) | ||
* send sy257 which just arrived | * send sy257 which just arrived from repair back to repair (Jacobs) | ||
'''G9-FROST preparations''' | '''G9-FROST preparations''' | ||
Line 47: | Line 47: | ||
* ADBs, level2 check (Chris) | * ADBs, level2 check (Chris) | ||
* pedestal run (soft fixed) | * pedestal run (soft fixed); make 'netonpmc' etc to switch automatically based on CODA configuration | ||
* TDC, TOF laser, EC calibration runs | * TDC, TOF laser, EC calibration runs | ||
* new SILO directory 'g9a' | * ask CC to create new SILO directory 'g9a' | ||
* fix list of logbook | * fix list of logbook recievers (run coordinator, PDL): Dan is PDL, Eugene is run coordinator | ||
* trigger: single sector TOFxST with and without Level2 (sector-based); | * trigger: single sector TOFxST with and without Level2 (sector-based); normalization trigger sync 1 only (grom g13_norm): | ||
copy from g8b | copy from g8b | ||
* helicity correction: fix error around flip | * helicity correction: fix error around helicity flip | ||
* before and during the run we'll use [[G9-FROST]] page to store information related to the DAQ/Online systems | * before and during the run we'll use [[G9-FROST]] page to store information related to the DAQ/Online systems | ||
* new EPICS channels from target, list will come from Eugene; check existing list for availability, add new if necessary | * add new EPICS channels from target, list will come from Eugene; check existing list for availability, add new if necessary | ||
fast and | into fast and slow EPIC banks insertion process | ||
* run starts Oct 23 (commissioning for 6 days) | * run starts Oct 23 (commissioning for 6 days) |
Latest revision as of 12:59, 16 October 2007
present: Sergey Boyarinov, Elliott Wolin, Eugene Pasyuk, Benjamin Raydo, Nerses Gevorgyan, Nikolay Balasanyan, Tanest Chinwanawich, Serguei Pozdnyakov, Stepan Stepanyan
DVCS Trigger System
Following progress was made since meeting last week:
- datafile containing DVCS raw data was created by Rustam and Sergey and passed to Ben
- Ben made event display to present and control cluster reconstruction process using Altera simulation tools; it has two adjustable parameters: single channel threshold (the same for all channels, was set to 50) and minimum number of hits per cluster (was set to 3); cluster finding window has fixed size 3x3 towers (bigger or variable size window requires more space in FPGA); future plan includes processing good file with different parameters, making 2-dimentional plots, getting efficiency, then processing all data and getting rejection
- we discussed how much regular user have to learn about v1495 programming; it maybe good idea to learn Altera graphic tool which allows to assemble simple logic from prepared components
- we've got quotation for 2 more v895 discriminators from CAEN, they will be ordered
- we talked very preliminary about hodoscope, which will be located in front of DVCS calorimeter and have about 60 channels; v895's discriminators and v1495's logic units must be purchased for that device; it will be good to have hodoscope drawing in a couple of months, we may consider to add hodoscope outputs to the DVCS trigger system
- we'll try to borrow one more v1495 from Hall A for 2-board testing
Projects
- 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100
- Carl Timmer finished new version of ET, it was installed into CLON area, everything looks good so far; et_2_et has new option direct for communication between machines which are not sharing subnets
- old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller were observed, workarounds implemented, may contact CAEN about that; will run for a while to get experience
TODO:
- sy527 mainframe in wolfram area need serial remote control
- include LAC into old EPICS GUIs
- ioc reboot/heartbeat buttons
- fix fan in mainframe 1 in LAC (Tom Carstens)
- send sy257 which just arrived from repair back to repair (Jacobs)
G9-FROST preparations
- CED for new TOFs
- online recsis (Eugene, Jerry)
- DC pulser run
- ADBs, level2 check (Chris)
- pedestal run (soft fixed); make 'netonpmc' etc to switch automatically based on CODA configuration
- TDC, TOF laser, EC calibration runs
- ask CC to create new SILO directory 'g9a'
- fix list of logbook recievers (run coordinator, PDL): Dan is PDL, Eugene is run coordinator
- trigger: single sector TOFxST with and without Level2 (sector-based); normalization trigger sync 1 only (grom g13_norm):
copy from g8b
- helicity correction: fix error around helicity flip
- before and during the run we'll use G9-FROST page to store information related to the DAQ/Online systems
- add new EPICS channels from target, list will come from Eugene; check existing list for availability, add new if necessary
into fast and slow EPIC banks insertion process
- run starts Oct 23 (commissioning for 6 days)