present: Sergey Boyarinov,  
present: Sergey Boyarinov, Elliott Wolin, Eugene Pasyuk, Benjamin Raydo, Nerses Gevorgyan, Nikolay Balasanyan, Tanest Chinwanawich, Serguei Pozdnyakov, Stepan Stepanyan


'''DVCS Trigger System'''
'''DVCS Trigger System'''


* datafile containing DVCS raw data was created and passed to Ben
Following progress was made since meeting last week:


* got quotation for 2 more v895 discriminators, will be ordered
* datafile containing DVCS raw data was created by Rustam and Sergey and passed to Ben
 
* Ben made event display to present and control cluster reconstruction process using Altera simulation tools; it has two adjustable parameters: single channel threshold (the same for all channels, was set to 50) and minimum number of hits per cluster (was set to 3); cluster finding window has fixed size 3x3 towers (bigger or variable size window requires more space in FPGA); future plan includes processing good file with different parameters, making 2-dimentional plots, getting efficiency, then processing all data and getting rejection
 
* we discussed how much regular user have to learn about v1495 programming; it maybe good idea to learn Altera graphic tool which allows to assemble simple logic from prepared components
 
* we've got quotation for 2 more v895 discriminators from CAEN, they will be ordered
 
* we talked very preliminary about hodoscope, which will be located in front of DVCS calorimeter and have about 60 channels; v895's  discriminators and v1495's logic units must be purchased for that device; it will be good to have hodoscope drawing in a couple of months, we may consider to add hodoscope outputs to the DVCS trigger system
 
* we'll try to borrow one more v1495 from Hall A for 2-board testing


''' Projects'''
''' Projects'''
Line 11: Line 21:
* 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100
* 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100


* new ET installed, everything looks good so far; ''et_2_et'' has new option ''direct'' for communication between machines which are not sharing any subnets
* Carl Timmer finished new version of ET, it was installed into CLON area, everything looks good so far; ''et_2_et'' has new option ''direct'' for communication between machines which are not sharing subnets


* old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller; will run for a while to get experience
* old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller were observed, workarounds implemented, may contact CAEN about that; will run for a while to get experience


TODO:
TODO:
* sy527 mainframe in wolfram area need serial remote control


* include LAC into old EPICS GUIs
* include LAC into old EPICS GUIs


* ioc reboot buttons
* ioc reboot/heartbeat buttons


* fix fan in mainframe 1 in LAC (Tom Carstens)
* fix fan in mainframe 1 in LAC (Tom Carstens)


* send sy257 which just arrived fro repair back to repair (who is tracking them ?)
* send sy257 which just arrived from repair back to repair (Jacobs)


'''G9-FROST preparations'''
'''G9-FROST preparations'''


* calibration runs
* CED for new TOFs
 
* online recsis (Eugene, Jerry)
 
* DC pulser run
 
* ADBs, level2 check (Chris)
 
* pedestal run (soft fixed); make 'netonpmc' etc to switch automatically based on CODA configuration
 
* TDC, TOF laser, EC calibration runs
 
* ask CC to create new SILO directory 'g9a'
 
* fix list of logbook recievers (run coordinator, PDL): Dan is PDL, Eugene is run coordinator
 
* trigger: single sector TOFxST with and without Level2 (sector-based); normalization trigger sync 1 only (grom g13_norm):
copy from g8b


* new SILO directory
* helicity correction: fix error around helicity flip


* fix list of page receivers (run coordinator, PDL - what time periods ?)
* before and during the run we'll use [[G9-FROST]] page to store information related to the DAQ/Online systems


* helicity correction: fix error around flip
* add new EPICS channels from target, list will come from Eugene; check existing list for availability, add new if necessary
into fast and slow EPIC banks insertion process


* before and during the run we'll use [G9-FROST] page to store online-system-related run information
* run starts Oct 23 (commissioning for 6 days)

Latest revision as of 12:59, 16 October 2007

present: Sergey Boyarinov, Elliott Wolin, Eugene Pasyuk, Benjamin Raydo, Nerses Gevorgyan, Nikolay Balasanyan, Tanest Chinwanawich, Serguei Pozdnyakov, Stepan Stepanyan

DVCS Trigger System

Following progress was made since meeting last week:

  • datafile containing DVCS raw data was created by Rustam and Sergey and passed to Ben
  • Ben made event display to present and control cluster reconstruction process using Altera simulation tools; it has two adjustable parameters: single channel threshold (the same for all channels, was set to 50) and minimum number of hits per cluster (was set to 3); cluster finding window has fixed size 3x3 towers (bigger or variable size window requires more space in FPGA); future plan includes processing good file with different parameters, making 2-dimentional plots, getting efficiency, then processing all data and getting rejection
  • we discussed how much regular user have to learn about v1495 programming; it maybe good idea to learn Altera graphic tool which allows to assemble simple logic from prepared components
  • we've got quotation for 2 more v895 discriminators from CAEN, they will be ordered
  • we talked very preliminary about hodoscope, which will be located in front of DVCS calorimeter and have about 60 channels; v895's discriminators and v1495's logic units must be purchased for that device; it will be good to have hodoscope drawing in a couple of months, we may consider to add hodoscope outputs to the DVCS trigger system
  • we'll try to borrow one more v1495 from Hall A for 2-board testing

Projects

  • 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100
  • Carl Timmer finished new version of ET, it was installed into CLON area, everything looks good so far; et_2_et has new option direct for communication between machines which are not sharing subnets
  • old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller were observed, workarounds implemented, may contact CAEN about that; will run for a while to get experience

TODO:

  • sy527 mainframe in wolfram area need serial remote control
  • include LAC into old EPICS GUIs
  • ioc reboot/heartbeat buttons
  • fix fan in mainframe 1 in LAC (Tom Carstens)
  • send sy257 which just arrived from repair back to repair (Jacobs)

G9-FROST preparations

  • CED for new TOFs
  • online recsis (Eugene, Jerry)
  • DC pulser run
  • ADBs, level2 check (Chris)
  • pedestal run (soft fixed); make 'netonpmc' etc to switch automatically based on CODA configuration
  • TDC, TOF laser, EC calibration runs
  • ask CC to create new SILO directory 'g9a'
  • fix list of logbook recievers (run coordinator, PDL): Dan is PDL, Eugene is run coordinator
  • trigger: single sector TOFxST with and without Level2 (sector-based); normalization trigger sync 1 only (grom g13_norm):

copy from g8b

  • helicity correction: fix error around helicity flip
  • before and during the run we'll use G9-FROST page to store information related to the DAQ/Online systems
  • add new EPICS channels from target, list will come from Eugene; check existing list for availability, add new if necessary

into fast and slow EPIC banks insertion process

  • run starts Oct 23 (commissioning for 6 days)