<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=October_17%2C_2012_online_meeting_minutes</id>
	<title>October 17, 2012 online meeting minutes - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=October_17%2C_2012_online_meeting_minutes"/>
	<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=October_17,_2012_online_meeting_minutes&amp;action=history"/>
	<updated>2026-05-07T11:38:03Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.1</generator>
	<entry>
		<id>https://clonwiki0.jlab.org/wiki/index.php?title=October_17,_2012_online_meeting_minutes&amp;diff=5953&amp;oldid=prev</id>
		<title>129.57.81.115: Created page with &quot;present: Sergey Boyarinov, Sergey Pozdnyakov  1. CLAS12 construction:  * 2 racks were moved to the Hall from EEL by us, waining to be lifted to the FC level 3; support on level 3...&quot;</title>
		<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=October_17,_2012_online_meeting_minutes&amp;diff=5953&amp;oldid=prev"/>
		<updated>2012-10-17T14:16:24Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;present: Sergey Boyarinov, Sergey Pozdnyakov  1. CLAS12 construction:  * 2 racks were moved to the Hall from EEL by us, waining to be lifted to the FC level 3; support on level 3...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;present: Sergey Boyarinov, Sergey Pozdnyakov&lt;br /&gt;
&lt;br /&gt;
1. CLAS12 construction:&lt;br /&gt;
&lt;br /&gt;
* 2 racks were moved to the Hall from EEL by us, waining to be lifted to the FC level 3; support on level 3 was relocated but not attached to the floor yet, it can be done after racks are installed and connected to the adjacent ones&lt;br /&gt;
&lt;br /&gt;
* 4 crates were installed on Pie Tower level 2: vmetest0, vxstest0, ioctest0 and ioctest1; first 2 will be used as DAQ test setup, and last 2 as slow control test setup; ioctest1 will represent old ioc (epics3.13) where old drivers will be learned, and ioctest0 with mvme6100 and epics3.14 will be used as a testbed for old drivers re-writing and new drivers commissioning; Johann Goetz started to work with VS4 step motor control driver with Krister Bruhwel&lt;br /&gt;
&lt;br /&gt;
* still waiting for electrical to be done for UPSes and FC level 1, as well as for ethernet fibers by shields - will remind them&lt;br /&gt;
&lt;br /&gt;
* support needed for HV patch panels was ordered (vertical installation)&lt;br /&gt;
&lt;br /&gt;
* will restore a floor on FC level 2, decide on HV cables layout and start HV mainframes installation&lt;br /&gt;
&lt;br /&gt;
* will bring parts for new racks from the storage bldg and start assembly&lt;br /&gt;
&lt;br /&gt;
* after the meeting with manufacturer 2 set of labels will be ordered  after new quota will be sent to us&lt;/div&gt;</summary>
		<author><name>129.57.81.115</name></author>
	</entry>
</feed>