<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=May_20%2C_2009_online_meeting_minutes</id>
	<title>May 20, 2009 online meeting minutes - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=May_20%2C_2009_online_meeting_minutes"/>
	<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=May_20,_2009_online_meeting_minutes&amp;action=history"/>
	<updated>2026-05-07T11:38:08Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.1</generator>
	<entry>
		<id>https://clonwiki0.jlab.org/wiki/index.php?title=May_20,_2009_online_meeting_minutes&amp;diff=4287&amp;oldid=prev</id>
		<title>129.57.80.127 at 14:31, 20 May 2009</title>
		<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=May_20,_2009_online_meeting_minutes&amp;diff=4287&amp;oldid=prev"/>
		<updated>2009-05-20T14:31:13Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;present: Sergey Boyarinov, Sergey Pozdnyakov&lt;br /&gt;
&lt;br /&gt;
1. HV&lt;br /&gt;
&lt;br /&gt;
* one of the TOF Lecroy mainframes was replaced by TOF team, spare was takes from the counting house; will not send broken Lecroy mainframe to repair yet to save money, upgrade needed and it will cost about $7000; 3 boards were moved from the hall to the test setup, 2 of them seems fine (one of them had tilted pin in bus connector); need better organized HV repair procedure, last time 4 boards were broken in a process in counting house test setup, need a meeting with all personal involved&lt;br /&gt;
&lt;br /&gt;
* glued patch panels seems working fine, will use that method in future; 2 channels in 2 A1535 boards were broken and will be repaired; will ask Chris to repair and check calibration; if calibration is bad then will send it to CAEN; third board (unvisible in mainframe) will be stripped, and then send to CAEN&lt;br /&gt;
&lt;br /&gt;
* continue to work with CAEN on SY1527/A1535 16-slot problem&lt;br /&gt;
&lt;br /&gt;
2. DAQ:&lt;br /&gt;
&lt;br /&gt;
* polar readout was changed, scaler opens in first event now (was in Go), does not crash on first event any more&lt;br /&gt;
&lt;br /&gt;
* it was observed that if ROCs running for the long time (week and more) they must be rebooted, otherwise they starting to crash one after another, need to understand the reason; in a meanwhile will run &amp;#039;net&amp;#039; only on PMCs, will see if it cost by &amp;#039;net&amp;#039; or &amp;#039;proc&amp;#039;&lt;br /&gt;
&lt;br /&gt;
* sc2 is crashing about once per shift, under investigation&lt;br /&gt;
&lt;br /&gt;
* disconnected front-end-busy cable from SF to FC was disconnected on the floor, it cost missing gate errors in DC  crates; cable was labeled and connected &lt;br /&gt;
&lt;br /&gt;
* &amp;#039;mysql not available&amp;#039; error was observed in runcontrol, also all rocs reboot sometimes cost database to not respond fast enough, need to investigate&lt;br /&gt;
&lt;br /&gt;
3. Run database&lt;br /&gt;
&lt;br /&gt;
* run_log_restore program is ready, it will restore 3 ascii files in $CLON_PARMS area, which will be used to update database; will create a cron job to extract files from SILO and scan them one by one; 2 copies will be run: on clondaq2 to restore new files from raid, and on clonmon1 to restore old files from SILO&lt;/div&gt;</summary>
		<author><name>129.57.80.127</name></author>
	</entry>
</feed>