<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=March_20%2C_2013_online_meeting_minutes</id>
	<title>March 20, 2013 online meeting minutes - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=March_20%2C_2013_online_meeting_minutes"/>
	<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=March_20,_2013_online_meeting_minutes&amp;action=history"/>
	<updated>2026-04-09T19:17:36Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.1</generator>
	<entry>
		<id>https://clonwiki0.jlab.org/wiki/index.php?title=March_20,_2013_online_meeting_minutes&amp;diff=6061&amp;oldid=prev</id>
		<title>129.57.81.115: Created page with &quot;present: Sergey Boyarinov, Sergey Pozdnyakov  1. CLAS12  * all boards inserted in FC crates equipped with barcode labels and inserted into inventory database; 3 boxes of remainin...&quot;</title>
		<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=March_20,_2013_online_meeting_minutes&amp;diff=6061&amp;oldid=prev"/>
		<updated>2013-03-20T14:37:59Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;present: Sergey Boyarinov, Sergey Pozdnyakov  1. CLAS12  * all boards inserted in FC crates equipped with barcode labels and inserted into inventory database; 3 boxes of remainin...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;present: Sergey Boyarinov, Sergey Pozdnyakov&lt;br /&gt;
&lt;br /&gt;
1. CLAS12&lt;br /&gt;
&lt;br /&gt;
* all boards inserted in FC crates equipped with barcode labels and inserted into inventory database; 3 boxes of remaining FADCs still in Sergey B. office waiting to be moved to the hall; boards are not inserted completely, waiting for switches setup&lt;br /&gt;
&lt;br /&gt;
* HV patch panels testing under way, all HV boards are completely tested&lt;br /&gt;
&lt;br /&gt;
* electricians started to work, should be done by summer&lt;br /&gt;
&lt;br /&gt;
* 2 new switches prepared by CC moved to FC level3, neet to be installed&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2 test setups&lt;br /&gt;
&lt;br /&gt;
* old laser-related equipment from the hall will be moved to ctof test setup (Baturin)&lt;br /&gt;
&lt;br /&gt;
* ftof setup is operational, working on analysis software; 2-crate configuration works after TI firmware upgrade, ftof0 is master with FADCs and ftof1 is slave with dsc2s, v1290s and v1495; some sync problems between crates still under investigation&lt;br /&gt;
&lt;br /&gt;
* pcal, dcrb, svt must be upgraded with recent firmware as well&lt;/div&gt;</summary>
		<author><name>129.57.81.115</name></author>
	</entry>
</feed>