<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=March_10%2C_2010_online_meeting_minutes</id>
	<title>March 10, 2010 online meeting minutes - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=March_10%2C_2010_online_meeting_minutes"/>
	<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=March_10,_2010_online_meeting_minutes&amp;action=history"/>
	<updated>2026-04-08T08:08:27Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.1</generator>
	<entry>
		<id>https://clonwiki0.jlab.org/wiki/index.php?title=March_10,_2010_online_meeting_minutes&amp;diff=4684&amp;oldid=prev</id>
		<title>129.57.76.146 at 17:04, 10 March 2010</title>
		<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=March_10,_2010_online_meeting_minutes&amp;diff=4684&amp;oldid=prev"/>
		<updated>2010-03-10T17:04:47Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;present: Sergey Boyarinov, Sergey Pozdnyakov, Patrick Collins, Eugene Pasyuk, Hovanes, Ben Raydo&lt;br /&gt;
&lt;br /&gt;
1. Helicity: optic-nim converter installed in the Counting Room, all 4 helicity signals from MCC panel looks good; will do final check in the Hall; two user bits in polar struck scalers will be helicity and quartet; helicity strob will be used to generate program1 events; need to check 500us in polar area (comes from FC ?)&lt;br /&gt;
&lt;br /&gt;
2. level2 was rewired after relocation to clastrig2, software was adjusted. Ben has new version of Level1 trigger firmware/software, Chris tested all signals coming from Drift Chamber, will test everything together today; will be good to cleanup upper camac crate in trigger rack; ST ADC gate must be checked&lt;br /&gt;
&lt;br /&gt;
3. Calibration runs will be started as soon as trigger system and whole DAQ are tested, TOF and EC as usual (no CC)&lt;br /&gt;
&lt;br /&gt;
4. DAQ was tested reading Drift Chamber with pulser trigger, today after CLAS final assembly full DAQ test will be conducted&lt;br /&gt;
&lt;br /&gt;
5. New partition g9frost was created on SILO and in stage area, will switch today; check why do not have 10GBit to sfs61&lt;br /&gt;
&lt;br /&gt;
6. New EPICS variables to be tested (Stepan&amp;#039;s emain), check databases; check TESC bank contents&lt;br /&gt;
&lt;br /&gt;
7. Trigger configs: g12 examples can be used, Eugene will ask Valery to copy and then adjust if necessary, including normalization to MOR trigger input&lt;br /&gt;
&lt;br /&gt;
8. Official start tomorrow with 5 days comissioning&lt;/div&gt;</summary>
		<author><name>129.57.76.146</name></author>
	</entry>
</feed>