<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=August_29%2C_2012_online_meeting_minutes</id>
	<title>August 29, 2012 online meeting minutes - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=August_29%2C_2012_online_meeting_minutes"/>
	<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=August_29,_2012_online_meeting_minutes&amp;action=history"/>
	<updated>2026-05-07T12:38:37Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.1</generator>
	<entry>
		<id>https://clonwiki0.jlab.org/wiki/index.php?title=August_29,_2012_online_meeting_minutes&amp;diff=5918&amp;oldid=prev</id>
		<title>129.57.81.115: Created page with &quot;present: Sergey Boyarinov, Sergey Pozdnyakov  * counting house was cleaned up; in room 102 all racks were moved to storage, waiting for the property to take excessed equipment (d...&quot;</title>
		<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=August_29,_2012_online_meeting_minutes&amp;diff=5918&amp;oldid=prev"/>
		<updated>2012-08-29T14:07:55Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;present: Sergey Boyarinov, Sergey Pozdnyakov  * counting house was cleaned up; in room 102 all racks were moved to storage, waiting for the property to take excessed equipment (d...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;present: Sergey Boyarinov, Sergey Pozdnyakov&lt;br /&gt;
&lt;br /&gt;
* counting house was cleaned up; in room 102 all racks were moved to storage, waiting for the property to take excessed equipment (done !); in room 102A all racks and shelfs were cleaned up, some stuff trashed and other stored inside racks; after cleanup is finished counting room will be ready for renovation; few crates still have to be moved to the hall&lt;br /&gt;
&lt;br /&gt;
* HV test setup will be reinstated on Pie Tower, need to restore 10G fiber patch panel disconnected during cleanup, and install new switch; still need to test 40 new boards, and patch panels; 2 more mainframes still in Fernando&amp;#039;s lab, and one more to be received from CAEN&lt;br /&gt;
&lt;br /&gt;
* GOOD cordless phone(s) needed in the hall (with headphones)&lt;br /&gt;
&lt;br /&gt;
* 2 UPSes were moved from counting room to the hall (racks L1-17 and PI 2-2), request was placed to connect them to the emergency generator&lt;br /&gt;
&lt;br /&gt;
* PR placed for scanner equipment&lt;/div&gt;</summary>
		<author><name>129.57.81.115</name></author>
	</entry>
</feed>