<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=April_3%2C_2013_online_meeting_minutes</id>
	<title>April 3, 2013 online meeting minutes - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://clonwiki0.jlab.org/wiki/index.php?action=history&amp;feed=atom&amp;title=April_3%2C_2013_online_meeting_minutes"/>
	<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=April_3,_2013_online_meeting_minutes&amp;action=history"/>
	<updated>2026-05-07T11:38:02Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.1</generator>
	<entry>
		<id>https://clonwiki0.jlab.org/wiki/index.php?title=April_3,_2013_online_meeting_minutes&amp;diff=6064&amp;oldid=prev</id>
		<title>129.57.81.115: Created page with &quot;present: Sergey Boyarinov, Sergey Pozdnyakov  1. CLAS12 installation: patch panel is under testing, remaining FADCs still to be moved to the hall; AC power work started on FC  2....&quot;</title>
		<link rel="alternate" type="text/html" href="https://clonwiki0.jlab.org/wiki/index.php?title=April_3,_2013_online_meeting_minutes&amp;diff=6064&amp;oldid=prev"/>
		<updated>2013-04-03T14:11:35Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;present: Sergey Boyarinov, Sergey Pozdnyakov  1. CLAS12 installation: patch panel is under testing, remaining FADCs still to be moved to the hall; AC power work started on FC  2....&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;present: Sergey Boyarinov, Sergey Pozdnyakov&lt;br /&gt;
&lt;br /&gt;
1. CLAS12 installation: patch panel is under testing, remaining FADCs still to be moved to the hall; AC power work started on FC&lt;br /&gt;
&lt;br /&gt;
2. Test setups: FTOF is running fine, Dan is working on calibration (HV is done, timing under way); TEDF building test setup to be rebuild in new location; ethernet wall socket 1A-PP1-19 was rerouted to subnet 86 by Brent, will test today and reconnect all network equipment; VXS crate with FADCs and other boards will be installed&lt;/div&gt;</summary>
		<author><name>129.57.81.115</name></author>
	</entry>
</feed>