¥
a) FADC boards studies
¥ manpower: contract
scientist
¥ duration: 6
month
¥ predecessors:
none
¥ work description: install and study
Struck SIS3320 FADC board (12bit 200MHz 2eSST readout) in test setup and in
Hall B; obtain data from CLAS detectors and compare them with Lecroy 1881M
data; provide all necessary software libraries; study other FADC boards if available
¥
¥
b) FADC data analysis
¥ manpower:
scientist
¥ duration: 3
month
¥ predecessors:
(a)
¥ work description: analyze FADC data
offline; make decisions on data format and data
processing algorithms, including recommendations for FADC sums output
¥