¥
a) FADC boards studies
¥ manpower:
contract scientist
¥ duration: 6
month
¥
predecessors: none
¥ work description: install and study
Struck SIS3320 FADC board (12bit 200MHz 2eSST readout) in test setup and in Hall B; obtain data from
CLAS detectors and compare them with Lecroy 1881M data; provide all necessary software
libraries; study other FADC boards if available
¥
b) FADC data analysis
¥ manpower:
scientist
¥ duration: 3
month
¥
predecessors: (a)
¥ work description: analyze FADC data
offline; make decisions on data format and data processing algorithms, including recommendations for FADC
sums output
¥